Construction software for the problems your site actually has

Four products already working on construction sites, and custom software when what you need does not exist yet.

Working in India? See our Ahmedabad page

In use on three job sites in India, including a hospital.

CONSTRUCTION TECH ·
BIM TO BOQ ·
AR SITE VALIDATION ·
LIDAR MEASUREMENT ·
4D SCHEDULING ·
ISO 19650 ·
SELF-HOSTED ·
CONSTRUCTION TECH ·
BIM TO BOQ ·
AR SITE VALIDATION ·
LIDAR MEASUREMENT ·
4D SCHEDULING ·
ISO 19650 ·
SELF-HOSTED ·

What we solve

Start with the problem you have.

Pick the problem you have

Plan versus reality: overlay the model on the real build and see where they diverge.

DeltaARBIMSee it on a live site
The live DeltaARBIM AR overlay on a wall on site, comparing the build against the model.Real app

A site measurement app on iPhone. Walls, rooms and openings measured with LiDAR, without a tape, a laser distance meter or a second visit.

DeltaTapelessHow LiDAR measurement works
A wall measured with DeltaTapeless, showing the captured dimensions from a LiDAR scan.Real app

Quantity takeoff derived from model geometry, not retyped from drawings.

DeltaERP

Openings are deducted from gross, and the deduction stays visible in the line.

See DeltaERP
Quantities derived from model geometry, landing as priced positions in a bill.Real app

Scan a room, plan the layout, agree it before anyone lifts a tool.

DeltaRoomCraftDeltaRoomCraft
Illustration of a DeltaRoomCraft room plan at true scale: a 4.20 by 3.00 metre room, empty on one side and furnished on the other.Illustration

One bill drives the 4D schedule, the S-curve and earned value from the same numbers.

DeltaERPSee DeltaERP
A 4D schedule showing cost against programme across the project timeline.Real app

We build it. Same engine, your workflow, your data, your server.

Custom buildTell us what you need

How a custom build starts

  1. 01A call about the problem
  2. 02A small proof of concept on your model or site
  3. 03Build in milestones
  4. 04You own the code
Tell us the construction problem

AI proposes. Geometry calculates.

Recognition may be AI-assisted. The quantity is calculated from inspectable geometry, never from a model's estimate.

Built for construction

Four products, one engine.

All four are built for construction and run on the same spatial engine.

DeltaERP: 189 modules, 39 languages, 10 regional packs, 100% self-hosted.

Proof

Already working on real sites.

DeltaARBIM is in use on three job sites in India: two commercial complexes and a hospital operating theatre wing, where rated walls, medical gas and HVAC were checked against the model to about 2 cm.

Reach

Where construction tech reaches

One engine, four domains. The same spatial and cost core runs from the site through to the operator.

Site and build, ConTech

Validation, takeoff, scheduling and the site record, running in production.

Property and portfolio, PropTech

Asset data, condition capture and space records across a portfolio.

Commercial real estate, CREtech

Measured space feeding valuation and portfolio decisions.

Facilities and handover

COBie deliverables and the asset register the operator inherits.

What we can build

Solution types we build

Site automation

Capture, check and record without paper.

Digital BIM plans

Drawings and models a site team can actually use.

Project management

Programme, cost, issues and documents in one record.

Predictive scheduling

Programme that moves when the site moves.

BOQ and estimating

Quantities from geometry, priced and traceable.

Site measurement

Measurement apps for walls, rooms and openings, checked against a laser meter before rollout.

Progress and quality

Percent complete, NCRs, snags, photo-backed.

Asset and handover data

What the operator inherits on day one.

Concrete walls and slabs, masonry, columns, foundations, openings, recesses and penetrations.

Formwork measured in square metres of contact surface.

Some of these ship inside our products. The rest we build for you.

Not sure which one you need? Tell us the problem.

Fit check

Does it take what you have?

Pick a format or standard

Regional packs: India, Middle East, UK, US, DACH, Asia-Pacific.

Self-hosted means data residency is yours by default, not a setting you have to find.

ISO 19650 throughout, with country coding on top: MasterFormat, NRM, DIN 276, GAEB, and regional packs for India and the Middle East.

Shivlam delivered our iOS and Android apps ahead of schedule with flawless architecture. Their communication across time zones was effortless, and the final build exceeded our expectations.
Marcus Vance · VP of Product, Apex Digital Labs, USA

01 / 05

Testimonial 1 of 5: Shivlam delivered our iOS and Android apps ahead of schedule with flawless architecture. Their communication across time zones was effortless, and the final build exceeded our expectations.

Your problem may not be on that list

Tell us the construction problem. We will work out whether it needs one of these products, a change to one, or something built from scratch.

  • You own the code.
  • Pay per milestone.
  • Your data stays yours: self-hosted or cloud.

FAQ

What construction teams ask first.

What is construction tech?

Construction tech, often shortened to ConTech, is the software and hardware that carries a project from design data to what is actually built: model coordination, quantity takeoff, cost and bill of quantities, scheduling, and verification on site. The useful test is whether the chain is continuous, so a quantity on site traces back to the geometry it came from rather than being retyped between tools. Shivlam builds that chain, with four products already used on construction projects and custom software where a firm's process does not fit a product.

Do you build construction project management software?

Yes, and part of it is already built. DeltaERP holds programme, cost, bill of quantities, documents and the site record in one place, self-hosted, with the measurement traced back to model geometry rather than retyped. It is built around quantities and cost rather than being a general-purpose project hub, so if you need something closer to a full suite, or an integration with the one you already run, that is a custom build and we take those on.

What is BIM coordination, and do you handle it?

BIM coordination is the work of federating the architectural, structural and MEP models, finding where they conflict, and agreeing who resolves each clash before it reaches site. We handle it: IFC is read natively, BCF 2.1 and 3.0 are supported with snapshots and viewpoints so issues move between tools, and every clash carries the cost of leaving it unresolved, priced at your own rates. DeltaARBIM then checks the coordinated model against the built work on site.

Do you work with EPC and PMC teams?

Yes, and they need different things. An EPC contractor needs measurement and cost to stay tied together across packages, so the bill, the programme and the site record come from one model rather than three spreadsheets. A PMC is usually checking someone else's work, so the value is evidence: progress recorded against the bill position it measures, clashes priced before they become site work, and an as built record that matches what was constructed. Both run self-hosted, which matters when the client's contract restricts where project data may sit.

Can a BIM company use this, or is it only for contractors?

A BIM company is one of the most direct fits. Scan to BIM work starts with a point cloud and ends with structured elements, which is the path the takeoff is built on: E57, LAS and LAZ register to the model, IFC carries full element data, and measurement stays tied to the geometry it came from. BCF, OpenCDE and ISO 19650 containers are supported, so coordination and as built deliverables move between your tools and your client's without a conversion step.

Does this cover PropTech and real estate, or only construction?

It reaches past construction. The same spatial and cost engine that measures a building going up measures one already standing, which is where PropTech and commercial real estate work begins: asset data, condition capture, space records, and measured space feeding valuation and portfolio decisions. Facilities teams take the other end of it, with COBie deliverables and the asset register an operator inherits at handover.

How do we start a construction software project with you?

Usually with a short call about the problem, then a small proof of concept on your own model or site before any long commitment. If one of our products already fits, we start with a demo of that instead.

Who owns the software you build for us?

On a custom project, you own the code. Our own products (DeltaARBIM, DeltaTapeless, DeltaERP, DeltaRoomCraft) stay ours and are licensed to you.

Does it work on our sites in India and abroad?

Yes. The products run offline on site and can be self-hosted, so they work in basements and on secure sites, and project data can stay in your country. Our team is in Ahmedabad and works with clients in India and abroad.

More on AR BIM validation, 3D capture and reconstruction, the products and how accurate phone LiDAR is on site.

Building a construction-tech product in the UAE or Singapore? Work with us.

Let's build it

Tell us what you want to build.

Two taps and a way to reach you. Only your name and an email or phone number are needed.

Who are you?
What is your role?
Which technology?
How should we reply?

Email or phone, whichever you prefer

+ Add your company
+ Add a note